• 尊龙凯时 - 人生就是搏!

    Stock Code:
    A 000055
    B 200055
    济南市
    Jinan Metro Line 2
    A total of 36 sides of 18 underground stations of Jinan R2 line phase I are equipped with full height adjustable ventilation platform door system, and a total of 2 sides of 1 elevated station are equipped with half height platform door system.
    济南R2线一期工程西起王府庄站,东至彭家庄站,共设车站19座。彭家庄站为高架站,其余车站均为地下车站。
    济南R2线一期18座地下车站共36侧设置全高可调通风型站台门系统,1座高架车站共2侧设置半高站台门系统。

    Previous project

    Shenzhen Metro Line 2

    Next project

    Hong Kong Shatin central line

    Copyright ©2021 Fangda Group Co., Ltd All Right Reserved. 粤ICP备05036140号-1